All production notes

Sometimes the right polish is a rollback

Four approved transition animations went into the game. Direct play sent us back to the previous run and jump.

Design changes1 min read

Retrospective production note. This date follows the production record, rather than the article’s publication.

Published

An approved animation can still turn out to be wrong for the game around it.

On October 24, four supplied Trashy transition animations were approved for the normal game. They connected starts, stops, running takeoffs, and the change from rising to falling.

The next day’s direct-play feedback changed the decision. First the previous grounded run behavior was restored. Then the new jump presentation was withdrawn too, returning the ordinary game to its previous animation package and timing.

The source artwork and approval history stayed intact. Rolling back the result didn’t mean pretending the experiment had never happened.

There is a useful distinction here between approving a candidate and living with its feel during play. A connection can look persuasive in a comparison and still interrupt the rhythm of the full action.

This was a reversal, and it belongs in the production story. Polish doesn’t have to mean keeping the newest thing. Sometimes it means being willing to return to the version that reads better, then using what the experiment taught us in the next attempt.